District Sangali Village Renavi

District Sanglli Village Revangaon

District Sangli Village Ghoti Khu

District Sangli Village Ghoti Khu

Trench Excavation

house
0
10

Villages Impacted

excavator
0
8746

CCT Length

A CCT (Continuous Contour Trench) is the most suitable technique for low rainfall, hilly or undulating terrain areas. Contour trenches are ditches dug along a hillside, which follow the contour of the hill and run perpendicular to the flow of water. The soil excavated from the ditch is used to form a berm on the downhill edge of the ditch. The berm is planted with permanent vegetation (native grass, legumes, etc.) to stabilise the soil and trap any sediment that would overflow from the trenches; thereby preserving fertile soil from being washed away.

Image
Life's Impacted : 1468
Life's Impacted : 914
Life's Impacted : 11090

Project Impact

dumper (1)
0
16493

Quantity Of Dumpers

crowd
0
13472

People Benefited

water-drop
0
164930
cubic m

Water Quantity

Click here to download the project details.

Get In Touch

If you wish to contribute to our journey, you can donate to our cause or join in our efforts by volunteering. If you wish to get in touch with us, please write to us at [email protected]